Project Highlight: Skokie Playfield | Unilock

Bitmap We’re Hiring! Start your career at Unilock and join our growing team.

en
    CN EN ES

Project Highlight: Skokie Playfield

Location: Winnetka, IL
Product: Eco-Priora™
Finish: Il Campo®
Size: 5 x 10 and 10 x 10
Colour: Coffee Creek & Heritage Brown
Square footage: 5,500
Designer: The Lakota Group
Engineer: Gewalt Hamilton Associates
Installer: LPS

Winnetka Park District worked with The Lakota Group and Gewalt Hamilton Associates on the first portion of a Master Plan enhancement of the Park District’s Skokie Playfield Complex. As this location is almost entirely within the floodplain, the Park Board and the Village (through their Environment & Forestry Committee) challenged the design team to integrate ‘green’ initiatives wherever possible and cost effective. The project included the enhancement of several turf fields and creation of a large multi-purpose synthetic field where there was an opportunity to collect and store rainwater in the aggregate base material below grade. In keeping with the ‘green’ request, Eco-Priora™ permeable pavers were chosen creating benefits for the park and adjacent properties during storm events.

We’re Here
To Help

Download the Design Idea Catalog

Find a Contractor You Can Trust

unilock visit idea center decor
Visit a Unilock Idea Center
Find a Location
Skip to content